TECHNICAL BULLETIN 31 JULY 19B4 ISSUE III THE "L" RUNDOWNS The L12 RUNDOWN STEP TWO STEP TWO, 3 S&D's 3 S&D's are run per PTS R/D procedure. The items found are blown with TECHNICAL BULLETIN 29 JULY 1983 Issue III L RUNDOWN TERMINAL PROCEDURE.